Choose an LRS-350-24 replacement for a 24 V bus after the cabinet records confirm that the failed part supplies that bus. A cabinet drawing may show a separate DC converter that receives 24 V and delivers 5 V to the LED modules. In that layout, the 24 V supply and 5 V converter are separate replacement items. The marking on a module identifies its input voltage. The nameplate and drawing identify the voltage at the part that needs replacement.
This spare-parts check applies to an existing cabinet with a documented 24 V feed and a separate converter. Start with the cabinet identifier, the failed position and the approved drawing. Those records give a buyer enough information to specify the spare even when the equipment is at another site.
Trace the documented power path
Start with the part position in the service ticket. In the documented example, the path runs from the upstream supply to the 24 V distribution bus and into a separate DC converter, which supplies the downstream 5 V load. A buyer who receives a photo of a module label sees only the last point in the path. Ask for the drawing and the marked position before assigning a part number.
ang LRS-350-24 product page identifies the upstream model discussed here. Mean Well’s LRS-350 specification dated September 12, 2025 lists its nominal output as 24 V DC and its adjustment range as 21.6 to 28.8 V. The converter’s documentation establishes its permitted input, output and approved use in the specific cabinet.

Some drawing sets carry a cabinet power label on the cover sheet and show individual voltages on later sheets. Find the sheet that connects the supply output to the converter input. If the drawing assigns references such as PS1 and DC1, ask the service team to use them in the request. The buyer can then distinguish two items even when the ticket uses the term power supply for both.
Record the LRS-350-24 replacement for a 24 V bus
For an LRS-350-24 replacement for a 24 V bus, copy the cabinet reference and voltage from each applicable stage into the service record. Use the drawing revision and the labels supplied by the service team. The same information can help the technician identify the spare when it arrives.
| Posisyon | Ebidensya nga pangayoon | What the record resolves |
|---|---|---|
| Upstream supply | Full model, DC output line and drawing reference | Identifies the unit that feeds the 24 V bus |
| 24 V bus | Drawing sheet, distribution label and converter input reference | Shows which loads and inputs share that source |
| DC converter | Model, input and output ratings and approved part reference | Identifies the stage that produces 5 V |
| 5 V load | Module input marking and connection reference | Confirms the downstream circuit |
| Replacement sign-off | Failed position, cabinet revision and written approval of the part number | Connects the order line to the affected circuit |
A hypothetical ticket could read “cabinet 08, PS1 failed, approved spare LRS-350-24, drawing revision C.” A ticket marked “cabinet 08, DC1 failed” would refer to the converter. Both tickets could concern a 5 V module that has gone dark. The position identified by the service team decides what goes in the order.

Resolve differences between the drawing and the cabinet
If the label photo conflicts with the drawing, hold the purchase line until the service lead resolves the difference. A prior repair may have altered one cabinet while the drawing describes another revision. Ask for the cabinet serial or build identifier, the sheet that applies to that cabinet and the part reference approved for the affected position. Use the confirmed reference for future orders and preserve the superseded entry in the service history.
ang LRS-350-5 listing identifies a separate supply with a nominal 5 V output and a similar enclosure. The LRS-350-24 replacement for a 24 V bus must match the documented upstream position. A proposed converter spare must meet the input and output requirements for the downstream position. For a new cabinet design and load sizing examples, see the LED power supply sizing guide.

Keep a replacement record for each cabinet revision in a mixed fleet. If multiple cabinets share a spare, identify the revisions approved to use it. That record helps when inventory staff see the series name on a bin and the full model on a purchase order. Retaining the drawing reference and the approval makes the decision traceable during the next service visit.
Before sending the order for an LRS-350-24 replacement for a 24 V bus, compare the service ticket with the proposed order line. Give the full model and the position it serves. Keep the cabinet reference on the packing list or in the service record when consolidating spares for several cabinets. If a substitute is proposed, send the part reference to the service lead for confirmation against the same revision.
Questions about the replacement record
Can I identify a failed stage from which modules went dark?
The affected area can help the service team locate the circuit on a drawing. Ask the team to confirm the failed position and the corresponding supply or converter reference before ordering. A dark module alone does not identify the failed stage.
What if an approved part number is available without a drawing?
Ask the cabinet manufacturer or service lead to confirm the part number for the cabinet serial and failed position. Keep that written confirmation with the order. Resolve a part number that covers several voltage variants to the exact approved suffix.
Should one spares line cover cabinets with and without a converter?
Keep a distinct line for each approved part and position. A cabinet with a direct 5 V supply and one with a 24 V bus followed by a converter may use similar modules. Their spare requirements follow the documented path and cabinet revision.
Request a spare for the identified position
When requesting an LRS-350-24 replacement for a 24 V bus, include the cabinet identifier, drawing revision, failed position and a clear nameplate photo. If there is a separate DC converter, add its model and drawing reference to show where the upstream supply fits in the existing path.
Send EagerLED the cabinet and spare details for a parts review. Include quantities by cabinet revision and leave final compatibility sign-off with the team responsible for the equipment.


